中文  |  ENGLISH
    Guangzhou Westpoint Pharmatech. Co., Ltd.
    Tel:0769-2223 5501
    Address: 4th Floor, 8th Building, Industrial Center, No. 19 Alishan Road, Songshan Lake High-tech Industrial Development Zone, Dongguan City, Guangdong Province

    Dongguan Westpoint Pharmatech. Co., Ltd.
    Tel:0769-2223 5501
    Address: 4th Floor, 8th Building, Industrial Center, No. 19 Alishan Road, Songshan Lake High-tech Industrial Development Zone, Dongguan City, Guangdong Province

    Jiangsu Westpoint Pharmaceutical Excipients Co., Ltd.
    Tel:0523-80103166
    Address: West side of 1st to 4th floor of G56 Standard Factory Building of China Pharmaceutical City Phase IV, Hailing District, Taizhou City, Jiangsu Province

Your location:Home > Facility Design

Manufacture facility design

Manufacture facility design is very important for the success of facility construction. Therefore, the scientific and reasonable three-step design is an important principle that must be followed.


Design method --- European and American consulting company

No.

Design steps

Staff

Goal

Quality Control

1

Project planning and URS

Pharmaceutical professionals

System project goal planning and requirement confirmation


2

Conceptual design

Pharmaceutical professionals

Determine all functions required by facility.

Audit and confirmation (DQ)

3

Preliminary design

Pharmaceutical and engineering professionals

Reach to the designing functions, including all materials and calculation of equipment parameter, such as air volume, pipe diameter, ect

Audit and confirmation (DQ)

4

Final construction drawing design

Engineering designer

Make construction drawings for construction workers

Audit and confirmation (DQ)

Scientific design is the key to ensure the project quality, the control of construction funds and the value of completed facilities. If the design is not based on product technology and process requirements, not based on equipment parameter requirements, or no calculation based on precise demand, it will not be reasonable. The project design will not produce reasonable results if there are no step by step conceptual design, preliminary design and final construction drawing design and without sufficient pharmaceutical practical experience and GMP implementation experience. In accordance with the feasible design method of European and American standard, we must avoid the project failure or huge financial waste caused by the above reasons and should build up a high-quality and cost-effective drug manufacture facilities


Conceptual design is the key to the whole design work, which decides the GMP quality and future performance of the established pharmaceutical facilities. Preliminary design is the process which will ensure the fully function of designed facility through engineering technology. Final construction drawing design is only for construction use. The importance of each step is different and it requires different professionals to handle it.


The design quality determines the final project quality. A project design needs many professionals in different scientific fields including implementation of pharmaceutical technologies and GMP regulation, comprehensive professionals who are able to combine pharmaceutical technologies and engineering equipment, and construction drawing designers with broad engineering experience. Beside complying with the GMP requirements, the main goal of the project design should be high quality, perfect performance, good looking of facility, convenient operation, environmental protection and safety.


Using European and American facility design standard and scientific design process, we have built a beautiful, high quality, high efficiency, high safety standard and environmental protection, highly intelligent and automatic, and high-end GMP standard pharmaceutical facility for you.